A hospital can’t close a wing for new lights
A hospital runs around the clock. Patient rooms stay occupied, corridors carry beds and carts, and some departments never close. A lighting retrofit has to fit around all of that, one area at a time. Your facility team knows which spaces can come out of service and when, so we plan the sequence with them before the first fixture comes down. We procure and stage the material by area, so each phase starts with what it needs on hand. Where an area can’t spare the daytime, we work nights and weekends.
Our own licensed electricians and apprentices do the install, so the people working in your building are people we employ. We’ve installed lighting across the country since 1997, healthcare included.
For ESCOs on hospital projects
Send us the fixture schedule, and we’ll price the labor line by line within 3–5 business days of a complete package. Our crews can work under your brand. The closeout package includes as-installed counts, red-line drawings, before-and-after fixture wattages, photos, and lamp and ballast disposal certificates, delivered within 10 business days of substantial completion.
We’re an SBA-certified Service-Disabled Veteran-Owned Small Business (SDVOSB), so on federal work our subcontract can count toward an SDVOSB subcontracting goal. See how we work with ESCOs.
The Lexington VA: an active hospital campus
At the Lexington VA Health Care System’s Troy Bowling Campus, we were the prime contractor on a campus-wide replacement of obsolete lighting. The VA awarded the contract in April 2024, with a 270-day performance period.
We phased each area across the active hospital campus with the VA’s contracting officer’s representative (COR) and alternate COR. Scope grew during performance, taking the contract from a $1.99 million base award to about $2.2 million at completion. Read the case study.
Garages and site lighting
A medical campus doesn’t stop at the building. Staff, patients, and visitors use the garages and parking lots at every hour.
In 2025 we upgraded the garage lighting at the Troy Bowling Campus in Lexington. In Louisville, we upgraded the site lighting across the Robley Rex VA Medical Center campus to LED in 2019.