Industry

Hospital lighting retrofits, planned around patient care

We retrofit lighting in hospitals and on medical campuses while they keep treating patients, as the prime contractor or as a subcontractor to your ESCO. At the Lexington VA’s Troy Bowling Campus, our own crews replaced obsolete lighting across an active hospital campus, phasing each area with the VA’s contracting officer’s representative.

A hospital can’t close a wing for new lights

A hospital runs around the clock. Patient rooms stay occupied, corridors carry beds and carts, and some departments never close. A lighting retrofit has to fit around all of that, one area at a time. Your facility team knows which spaces can come out of service and when, so we plan the sequence with them before the first fixture comes down. We procure and stage the material by area, so each phase starts with what it needs on hand. Where an area can’t spare the daytime, we work nights and weekends.

Our own licensed electricians and apprentices do the install, so the people working in your building are people we employ. We’ve installed lighting across the country since 1997, healthcare included.

For ESCOs on hospital projects

Send us the fixture schedule, and we’ll price the labor line by line within 3–5 business days of a complete package. Our crews can work under your brand. The closeout package includes as-installed counts, red-line drawings, before-and-after fixture wattages, photos, and lamp and ballast disposal certificates, delivered within 10 business days of substantial completion.

We’re an SBA-certified Service-Disabled Veteran-Owned Small Business (SDVOSB), so on federal work our subcontract can count toward an SDVOSB subcontracting goal. See how we work with ESCOs.

The Lexington VA: an active hospital campus

At the Lexington VA Health Care System’s Troy Bowling Campus, we were the prime contractor on a campus-wide replacement of obsolete lighting. The VA awarded the contract in April 2024, with a 270-day performance period.

We phased each area across the active hospital campus with the VA’s contracting officer’s representative (COR) and alternate COR. Scope grew during performance, taking the contract from a $1.99 million base award to about $2.2 million at completion. Read the case study.

Garages and site lighting

A medical campus doesn’t stop at the building. Staff, patients, and visitors use the garages and parking lots at every hour.

In 2025 we upgraded the garage lighting at the Troy Bowling Campus in Lexington. In Louisville, we upgraded the site lighting across the Robley Rex VA Medical Center campus to LED in 2019.

Proof on record

Jobs we’ve done, with the numbers.

$2.2M

at completion, up from a $1.99M base award

Replace obsolete lighting, Troy Bowling Campus

U.S. Department of Veterans Affairs · Lexington, KY · 2024–2025

Campus-wide lighting replacement in an active hospital

  • 270-day performance period
  • Phased with the VA’s COR
  • Prime contractor

Also on our record

YearClientProjectValue
2025U.S. Department of Veterans Affairs, Troy Bowling CampusLexington, KYGarage lighting upgrade$0–500K
2019U.S. Department of Veterans Affairs, Robley Rex VA Medical CenterLouisville, KYWhole-campus LED site lighting upgrade$0–500K
See every project

Questions

Straight answers.

Can you retrofit lighting in a hospital that stays open?

Yes. At the Lexington VA’s Troy Bowling Campus, we replaced obsolete lighting across an active hospital campus, phasing each area with the VA’s contracting officer’s representative (COR) and alternate COR. We plan the sequence with your facility team around patient care.

What lighting does a hospital need?

It depends on the space. A corridor, a patient room, and a parking garage each need different light, so we confirm the targets for each area with your facility team. Where light levels matter, photometric design (a computer model of the light in a space) shows the result before we install.

Can you install for an ESCO on a hospital project?

Yes. We price the labor line by line against your fixture schedule, and our crews can work under your brand. See how we work with ESCOs.

Do you retrofit hospital garages and site lighting too?

Yes. In 2025 we upgraded the garage lighting at the Troy Bowling Campus, and in 2019 we upgraded the site lighting across the Robley Rex VA Medical Center campus in Louisville to LED.

Send us the project.

ESCOs: send the fixture schedule and we’ll price the labor. Building owners: we’ll start with a free lighting audit.

Buildings over 75,000 sq ft may not qualify for a free audit. A full hospital, for example, can take two weeks to audit.