Multi-site lighting retrofit programs

We run lighting retrofits across portfolios of buildings, in one state or many, with one crew and one standard from the first site to the last. We mobilize nationwide from Louisville, and we’ve installed lighting across the country since 1997.

What a multi-site program is

One retrofit, many buildings: a chain of stores, a campus, a set of armories, a portfolio of offices. The work at each site looks alike, so the program comes down to logistics. That means getting material, lifts, and crews to the right place at the right time, and doing the work the same way everywhere.

How we mobilize, stage, and sequence

  • We set the standard once. One fixture and controls standard per space type, so the last site gets the same work as the first.
  • We stage material ahead of the crew. We procure the material and stage it by site and by area, so crews don’t wait on deliveries.
  • We sequence the sites. Around your operating hours, seasons, and priorities, with nights and weekends where a building needs them.
  • Our own crews travel. Licensed electricians and apprentices in DOL-approved apprenticeship programs, on our payroll. Not a different local sub in every city.
  • Every site closes out the same way. As-installed counts, red-line drawings, photos, and lamp and ballast disposal certificates.

For ESCOs

Delivering a multi-site program for your client? We price the labor line by line against your fixture schedule, within 3–5 business days of a complete package, and install it with our own crews. ESCO-branded crews are available if you want your name on site. See how we work with ESCO partners.

Retail and other portfolios

We’ve installed lighting across the country since 1997, in large retail, healthcare, military bases, offices, and nearly every other sector. (We don’t do transportation or sports lighting.) Store rollouts follow the same pattern: one standard per store type, material staged ahead, and crews working after hours so the stores stay open.

Where we’ve done it

For Greystar at the University of Kentucky in Lexington, we retrofitted 14 occupied student-housing buildings on a 24-month schedule (2020–2022): about 35,500 lamps and fixtures, with zero student displacement.

For University of Kentucky Campus Housing, we also did a campus-wide LED lighting upgrade (2023).

For the Kentucky National Guard, we’ve upgraded armory and cold-storage lighting at four sites: Ravenna, Hazard, and Glasgow (2025), and Richmond (2024).

Proof on record

Jobs we’ve done, with the numbers.

3,075,537kWh/yr

saved, beating projections

Student housing LED retrofit

University of Kentucky, for Greystar · Lexington, KY · 2020–2022

14 occupied buildings · 2,589,708 sq ft · about 35,500 lamps and fixtures

  • 319 kW demand reduction
  • $157,601 in utility incentives
  • Zero students displaced

Also on our record

YearClientProjectValue
2025Kentucky National GuardRavenna, KYArmory and cold storage lighting upgrade$0–500K
2025Kentucky National GuardHazard, KYArmory and cold storage lighting upgrade$0–500K
2025Kentucky National GuardGlasgow, KYArmory and cold storage lighting upgrade$0–500K
2024Kentucky National GuardRichmond, KYArmory and cold storage lighting upgrade$0–500K
2023University of Kentucky, Campus HousingLexington, KYCampus-wide LED lighting upgrade$1–3M
See every project

Questions

Straight answers.

Can you take on sites in more than one state?

Yes. We mobilize nationwide from Louisville with our own crews, and we’ve installed lighting across the country since 1997.

Will every site get the same work?

That’s the point of a program. We set one standard per space type, hold every crew to it, and close out each site with the same package.

Can your crews work under our brand?

Yes. ESCO-branded crews are available, so your client sees your name on site.

Do you work in retail stores?

Yes. Large retail has been part of our work since 1997, and we work nights and weekends so stores can stay open.

Send us the project.

ESCOs: send the fixture schedule and we’ll price the labor. Building owners: we’ll start with a free lighting audit.

Buildings over 75,000 sq ft may not qualify for a free audit. A full hospital, for example, can take two weeks to audit.