Self-perform vs. subcontract: choosing a lighting installation partner

Short answer: A self-performing installer puts its own electricians on your job. A broker wins the subcontract and hands the labor to other companies’ crews. On federal work, each extra tier is another payroll to collect, another safety program to trust, and another company whose unpaid wages can become your liability if you’re the prime.

Two ways to staff an install

The two models look alike on a bid form. In one, the installer’s own electricians and apprentices do the work, and the installer hires, pays, trains, and supervises them. In the other, the installer wins the subcontract, then passes some or all of the labor to local electrical contractors, sometimes a different one in each city. Plenty of firms sit in between. They self-perform most of the work and sub out a specialty scope or a remote site.

So “self-perform vs. subcontract” is rarely all or nothing. What matters on your job comes down to three facts: who employs the people on the lift, who supervises them day to day, and how many contracts sit between you and the crew.

Quality and schedule follow the payroll

An installer controls its own people directly. It can hold every crew to one install standard, move a foreman to the site that’s slipping, and add a crew when the building opens three floors this weekend instead of one. A broker controls its subs through a contract. It can hold payment or terminate, but it can’t assign people it doesn’t employ, and its subs may be booked on other work the week you need them.

Each tier is also a handoff. Your fixture schedule, phasing plan, and closeout requirements travel down the chain. The as-installed counts, wattages, red-lines, and disposal certificates your M&V plan depends on travel back up. The fewer handoffs, the fewer places for something to drop.

Safety responsibility doesn’t pass down the chain

On federal construction contracts, OSHA’s rules say the prime contractor “assumes the entire responsibility under the contract,” each subcontractor takes responsibility for its own portion, and for subcontracted work the prime and its subs “shall be deemed to have joint responsibility,” at any tier (29 CFR 1926.16).

On any site with several employers, OSHA can cite more than one of them for the same hazard. The controlling employer, the one with “general supervisory authority over the worksite,” must “exercise reasonable care to prevent and detect violations.” OSHA adds that more frequent inspection may be needed when the controlling employer has never worked with the other employer and doesn’t know its compliance history (OSHA Multi-Employer Citation Policy). A broker that brings a new local sub to each site hands whoever controls that site a new unknown every time.

Safety records have the same blind spot. An injury goes on the OSHA 300 log of the employer that supervises the worker day to day (29 CFR 1904.31). A broker’s log won’t show injuries to a crew its sub supervises. Ask for the records of the company whose people will be on site.

Prevailing wage and certified payroll on federal work

The Davis-Bacon and Related Acts apply to contractors and subcontractors on federally funded or assisted contracts over $2,000 for construction, alteration, or repair of public buildings or works, and they require at least the locally prevailing wages and fringe benefits (U.S. Department of Labor). The standard contract clauses in 29 CFR 5.5 set out what that means for each tier:

  • Certified payroll is weekly, at every tier. Each contractor or subcontractor submits certified payrolls for every week of covered work, and “the prime contractor is responsible for the submission of all certified payrolls by all subcontractors.” FAR 52.222-8 says the same for FAR contracts.
  • The prime answers for lower tiers. The prime “is responsible for the compliance by any subcontractor or lower tier subcontractor.” If wages go unpaid, the prime and the responsible subs are liable for what lower-tier workers are owed, with interest, and may face debarment. FAR 52.222-11 puts the same responsibility on the prime.
  • Withholding can reach your other contracts. To cover a prime’s or any sub’s wage liability, the agency can withhold funds from that contract, from any other federal contract with the same prime, or from any federally assisted Davis-Bacon contract the same prime holds.
  • Apprentice rates need registration. An apprentice can be paid below the journeyworker rate only if individually registered in a program registered with DOL’s Office of Apprenticeship or a state apprenticeship agency it recognizes (or, for the first 90 days, certified as eligible for probationary employment). Anyone paid an apprentice rate who doesn’t qualify must get the full rate for the work.

Each tier is one more payroll to collect, review, and stand behind. With a self-performing installer, there’s one.

A small-business set-aside raises a second issue. On special trade construction, FAR 52.219-14 caps what the prime pays subcontractors that aren’t “similarly situated” at 75% of what the government pays for performance, excluding materials (85% for general construction). Work that a similarly situated sub “further subcontracts” counts toward that cap. So a small-business installer that brokers its labor can push you past it.

When subcontracting makes sense

Subcontracting isn’t a flaw in itself. It’s often the right call when:

  • The site is small and far from anyone’s crews. If travel and per diem would cost more than a local sub’s markup, a vetted local contractor can be the better value.
  • The scope is outside the electrical trade. Ceiling grid, painting, or hazardous-material abatement belongs with the trade that does it.
  • The job has a requirement the installer can’t meet, such as a local license it doesn’t hold or a local-hire provision.
  • The installer needs surge capacity and brings in a sub it has worked with before, rather than starting late.

The test isn’t whether an installer ever subcontracts. It’s whether it tells you up front, names the sub, and stays accountable for the result.

Questions that show which kind of installer you have

  1. Who will be on site, and whose payroll are they on?
  2. What on this job will you subcontract, and to whom? Put the answer in the subcontract, with your written approval required for any change.
  3. Who is the foreman, and who employs them?
  4. Whose name will be on the certified payrolls?
  5. Are your apprentices individually registered, and in which program? Contractors with apprentices must keep written evidence of the program’s registration, each apprentice’s registration, and the ratios and wage rates (29 CFR 5.5).
  6. Whose EMR and OSHA logs cover the people doing the work?
  7. Who builds the closeout package, and from whose field records?

How we can help

At Lighting Retrofitters USA, we self-perform 100% of our installation labor: our own licensed electricians and apprentices in DOL-approved apprenticeship programs, not layers of subcontractors. We’re an SBA-certified Service-Disabled Veteran-Owned Small Business (SDVOSB), and we mobilize nationwide. Send a complete fixture schedule and we’ll return line-item labor pricing within 3–5 business days. ESCO-branded crews are available.

See how we work with ESCO partners, or read the jobs on record in projects, including 14 occupied student-housing buildings at the University of Kentucky, retrofitted on a 24-month schedule with zero student displacement. Then ask us every question on the list above.

Sources

  1. Davis-Bacon and Related ActsU.S. Department of Labor, Wage and Hour Division, Web page, read 2026-11-20
  2. 29 CFR 5.5, Contract provisions and related mattersU.S. Department of Labor (Electronic Code of Federal Regulations), eCFR, up to date as of 2026-11-18
  3. FAR 52.222-8, Payrolls and Basic Records (Jul 2021)Federal Acquisition Regulation (acquisition.gov), FAC 2026-01, effective 2026-03-13
  4. FAR 52.222-11, Subcontracts (Labor Standards) (May 2014)Federal Acquisition Regulation (acquisition.gov), FAC 2026-01, effective 2026-03-13
  5. FAR 52.219-14, Limitations on Subcontracting (Oct 2022)Federal Acquisition Regulation (acquisition.gov), FAC 2026-01, effective 2026-03-13
  6. 29 CFR Part 1926, Subpart B, General Interpretations (1926.10 to 1926.16)U.S. Department of Labor, OSHA (Electronic Code of Federal Regulations), eCFR, up to date as of 2026-11-18
  7. Multi-Employer Citation Policy (CPL 02-00-124)U.S. Department of Labor, OSHA, December 10, 1999
  8. 29 CFR 1904.31, Covered employeesU.S. Department of Labor, OSHA (Electronic Code of Federal Regulations), eCFR, up to date as of 2026-11-18