For building owners and managers

Lighting audit checklist for commercial buildings

Short answer: A lighting audit records every fixture in your building, space by space, including what it is, how many watts it draws, how long it runs, and what controls it. Add measured light levels, your utility rate, the rebates on offer, and any problems you find, and you have what you need to price a retrofit and estimate its payback. Work through the checklist below, then use the last section to judge the report.

Before you start

  • Twelve months of electric bills
  • Floor plans or lighting plans, if you have them
  • A light meter that reads footcandles, a ladder, a flashlight, and a camera
  • A spreadsheet with one row for each fixture type in each space

For a spreadsheet layout, Pennsylvania’s utility regulator publishes a Lighting Audit & Design Tool for its efficiency programs. Each line records the space, fixture code, wattage, quantity, and control type, before and after the retrofit, plus the hours of use.

A safety note: the ballast, which starts a fluorescent fixture’s lamps and controls their current, generally sits under a metal cover plate inside the fixture, EPA says. Have an electrician open fixtures to read ballast labels, and leave the ballasts closed: EPA generally doesn’t recommend opening them to sample their contents, because of the risk of exposure to polychlorinated biphenyls (PCBs).

Choose how deep to go

ASHRAE Standard 211 defines three levels of commercial building energy audit. DOE’s Federal Energy Management Program (FEMP) summarizes them from the 2018 edition:

Level What it covers
Level 1 Benchmarking energy use, a rate structure review, a site survey, an analysis of how spaces are used, no-cost and low-cost measures, and potential capital improvements
Level 2 Building operation and controls, energy end uses, efficiency measures, and the economic payback of each measure
Level 3 Detailed modeling or measurement, including seasonal and occupant variations, life-cycle cost analysis, and an analysis of implementation uncertainty

Those levels cover the whole building. A lighting audit covers one end use, in enough detail to price the work and estimate the payback.

1. Fixtures, space by space

For each space, record:

  • Space name or room number, and what the space is used for
  • Fixture type: troffer (a rectangular fixture that fits a dropped-ceiling grid, per DOE), pendant, strip, wraparound, high-bay, downlight, wall pack, or pole head
  • Fixture size, such as 1x4, 2x2, or 2x4
  • Lamp type, lamps per fixture, and the wattage printed on the lamp
  • Ballast type and the details on its label
  • Fixture wattage, as system input watts (lamps plus ballast)
  • Quantity, including fixtures that are out
  • Make and model, where you can see them

Lamp watts times the lamp count isn’t what the fixture draws, because the ballast changes it. Pennsylvania’s fixture table lists a fixture with three 32-watt T8 lamps on an instant-start, normal-light-output electronic ballast at 89 W, not 96 W, and a fixture with one 400-watt metal halide lamp at 458 W. Use a published table like that one, or the ballast maker’s data.

2. Mounting heights and ceilings

  • Mounting height of each fixture type, floor to fixture
  • Ceiling type: lay-in grid, hard ceiling, or open structure
  • Whether you can get above the ceiling, and anything that limits access
  • Any known asbestos or other hazardous material above the ceiling

Height decides whether the work needs ladders or lifts. Ceiling access decides the options: DOE notes that new fixtures will most likely require access above the ceiling, flags asbestos in the ceiling as a potential health hazard, and rates LED tubes and retrofit kits as good options where ceiling access is limited.

3. Hours of use

  • Hours per day and days per week, area by area
  • Who turns lights on early or leaves them on late: cleaning crews, security, deliveries
  • Areas that may be lit around the clock, such as stairwells, corridors, and garages

Hours drive savings as much as watts do. The Illinois Technical Reference Manual (TRM), the basis Illinois uses to calculate savings from its utilities’ efficiency programs, assumes 2,698 hours a year for a low-rise office, 3,135 for a warehouse, and 7,616 for a hospital. Use your building’s real hours, not a table’s.

4. Controls

  • What controls each space: a wall switch, an occupancy or vacancy sensor, a daylight sensor, a time clock, a photocell, or a building automation system
  • Whether each control works, or has been bypassed, covered, or overridden
  • Spaces that stay lit when they’re empty

Controls add savings on top of LED. The Illinois TRM gives an interior occupancy sensor an energy savings factor of 24%, and networked lighting controls 35% to 61%, depending on the type. Controls may also be required. DOE notes that virtually all energy codes in use today require some form of lighting control beyond a room switch. Check your state’s code through DOE’s Building Energy Codes Program.

5. Light levels

  • Measure illuminance with a light meter at the height where the work happens, such as the desk in an office or classroom
  • Take readings after dark, or note the daylight
  • Note spaces that are too dark or too bright, and any glare complaints
  • Compare each space with the recommended level for its use

Illuminance is the amount of light falling on a surface, measured in footcandles (fc); one footcandle is one lumen per square foot, per DOE. Recommended levels come from the Illuminating Engineering Society (IES). For example, DOE’s school upgrade guide cites the IES recommendation of 30–50 fc on the desks or task surfaces in classrooms, and DOE’s school specification guidance lists IES RP-3-20, Recommended Practice for Lighting Educational Facilities, as a design reference. Other spaces have other targets, so ask for the IES document behind each one. DOE’s FEMP guide adds that older eyes and highly detailed work may need more light.

Don’t assume today’s levels are right. DOE notes that many installed fluorescent systems provide more light than current standards require, and that in an over-lit space the greatest savings may come from lower-output fixtures, or fewer of them.

6. Utility rates and rebates

  • Your average rate: total charges divided by total kWh, from twelve months of bills
  • Your utility’s lighting rebate program: what it pays for, which products qualify, and its paperwork and deadlines
  • Whether the products you’re considering are listed by the DesignLights Consortium (DLC)

Use your own rate, not an average. The 2025 commercial average was 13.37 cents per kWh for the U.S. and 11.75 cents for Kentucky, per the U.S. Energy Information Administration. For rebates, the DLC, a nonprofit, says its Qualified Products Lists are required by nearly 700 utility and energy efficiency programs for rebate eligibility. DSIRE, run by the N.C. Clean Energy Technology Center at N.C. State University, lists incentive programs by state.

7. Condition problems

  • Lamps that are out, flickering, or buzzing
  • Ballast age. DOE doesn’t recommend Type A LED tubes, which run on the existing ballast, on a ballast that has been in use five years or longer.
  • Sockets that are blackened or cracked, lenses that are yellowed or cracked, and fixture interiors with peeling paint. DOE rates these as significant barriers to LED tubes, which reuse those parts.
  • Ballast labels. EPA says any fluorescent ballast made before July 2, 1979, may contain PCBs, and that ballasts without PCBs made from July 1, 1978, to July 1, 1998, had to be labeled “No PCBs.” Note any ballast that is unlabeled, old, or leaking; EPA treats leaking PCB capacitors as PCB waste.
  • Spent lamps, including any in storage. EPA lists fluorescent lamps as a common example of universal waste, a category with its own federal handling rules.

What the audit report should include

  • An inventory by space: fixture type, quantity, wattage, controls, and hours
  • A recommendation for each line (LED tube, retrofit kit, or new fixture), with the new wattage and the reason
  • Measured light levels next to the target for each space, with the source of each target
  • Annual kWh and dollars saved, with the rate and hours used
  • Controls recommendations, including any controls the energy code requires with the upgrade
  • A rebate estimate that names the program
  • The installed cost, the net cost after rebates, and the simple payback (net cost ÷ annual savings)
  • Condition and hazard notes, such as PCB-era ballasts, asbestos, and failed equipment

If a number in the report has no stated source or assumption, ask for one.

How we can help

We offer free lighting audits. We count every fixture, space by space, work out the light each space needs, and give you a savings model and a rebate estimate before you sign anything. Buildings over 75,000 sq ft may not qualify for a free audit.

Sources

  1. FEMP Facility Evaluation (Audit) DefinitionsU.S. Department of Energy, Federal Energy Management Program, December 2020
  2. 2026 TRM Appendix C: Lighting Audit & Design Tool for Commercial and Industrial ProjectsPennsylvania Public Utility Commission, 2026 TRM edition
  3. 2026 Illinois Statewide Technical Reference Manual for Energy Efficiency, Version 14.0 (Vol. 2, §4.5)Illinois Stakeholder Advisory Group, filed with the Illinois Commerce Commission, September 19, 2025 (effective January 1, 2026)
  4. Upgrading Linear Fluorescent Fixtures to LED in Schools (PNNL-35622)U.S. Department of Energy, November 2024
  5. Lighting Specification Guidance for Schools (PNNL-35623)U.S. Department of Energy, November 2024
  6. LED Retrofit Kits, TLEDs, and Lighting Controls: An Application Guide (DOE/EE 1544)U.S. Department of Energy, Federal Energy Management Program, March 2017
  7. PCBs in Fluorescent Light Ballasts (FLBs), fact sheet 530-F-20-005U.S. Environmental Protection Agency, July 2020
  8. Universal WasteU.S. Environmental Protection Agency, Updated September 18, 2026
  9. Electric Power Annual, Table 2.10, Average Price of Electricity to Ultimate Customers by End-Use Sector, by StateU.S. Energy Information Administration, October 21, 2026 (2025 data)
  10. DesignLights Consortium (DLC) Quick FactsDesignLights Consortium, Accessed November 20, 2026
  11. DSIREN.C. Clean Energy Technology Center, N.C. State University, Accessed November 20, 2026
  12. NIST Handbook 135: Life Cycle Costing Manual for the Federal Energy Management ProgramNational Institute of Standards and Technology, September 2020
  13. Building Energy Codes ProgramU.S. Department of Energy, Accessed November 20, 2026

Find out what your building would save.

Start with a free lighting audit. We’ll show you the fixtures, the savings, and the rebates before you commit to anything.

Buildings over 75,000 sq ft may not qualify for a free audit. A full hospital, for example, can take two weeks to audit.